Meaning
Inspection is the planned check of cast parts against the drawing and the agreed figures, covering size, hardness, color and visible faults. In vacuum casting the unit of inspection is the silicone tool, since each tool is a separate cavity. A plan that samples across a whole batch mixes several small populations. A plan per tool keeps them apart.Plan per Tool
A sound plan has 4 parts. A first article from each tool is measured on the features the drawing marks. A later copy from the same tool shows whether the tool has drifted. A hardness reading and a color check are made on parts from each pour. A marking or lot record ties every copy to its tool and pour.Read More
Pre-Reading Conditions
A part from a post-cure oven is inspected only after a stated cooling and conditioning. The atmospheres for that come from ISO 291. An order can make conditioning in a stated atmosphere a condition of inspection. Atmosphere and rest time are fixed before any tolerance is applied.Inspection Temperature
Size readings belong to the temperature at which they were taken. The critical features of the master are measured at the inspection temperature, and the temperature is recorded. The first article is cooled to the same temperature before its own reading.Tolerance Reference
ISO 20457 sets tolerances for plastic molded parts. Its scope names injection, compression, transfer and rotational molding, and other processes only by agreement. Vacuum casting is not named. A buyer who wants its tolerance classes on cast parts writes the standard into the order.Re-Inspection After Tool Change
First parts from a new silicone tool, or from an injection mold, are inspected as first articles again. The approval given to earlier parts does not transfer. In a multi-cavity mold, every cavity gets its own first article.Supplier Questions
A buyer asks for the inspection plan per tool and the drawing or standard it measures against. The buyer also asks how copies are marked. The answers belong to the batch plan before the first pour.